The principal part was completed in April 1991. In May of the same year, the bridge was open to test traffic. Chinese President Jiang Zemin not only inscribed the four-character title of the bridge “Xia Men Da Qiao” for it, but also came in person to cut the ribbon to inaugurate the bridge to traffic.
Consisting of the main bridge body, Jimei Crossroads, Gaoqi Bridge Approach and the automatic managing system, Xiamen Bridge is also the first cross-strait bridge in China. The main bridge body is 2,070 metres long and 23.5 metres wide. The non-stop Jimei Crossroads is made up of seven circuits. The 855-metre-long and 23.5-metre-wide Gaoqi Bridge Approach was built by the standard of the first class highroad. |